Copeland Rail Users Group

Manifesto

We are working towards these aims. The ones in red are considered more important

          Stations:                                           

  • Maintain platform lengths
  • Raise platform heights
  • Long-line audio/visual information and /or maintain hotline phone facility
  • Maintain notices/promotion
  • Protect & improve parking facilities
  • Promote facilities for cyclists
  • Improve platform access for cyclists and the disabled
  • Ensure road signage to/at stations
  • Monitor and improve environment (buildings, cleanliness, gardens, etc.)
  • Maintain staffing and opening hours at Whitehaven
  • Improve servicing of West Cumbria bay area at Carlisle.

        Services:                                           

  • More evenly spread daytime timetable
  • Later evening services
  • Sunday services between Barrow and Whitehaven (in the first instance Barrow to Millom)
  • Maintain WCML connections at Lancaster and Carlisle.
  • Improve connections/through services to Newcastle and to Preston & beyond.
  • Possible extension of TPE services to Millom

        Rolling Stock:

  • Abandonment of 142 Pacer usage
  • Monitor internal and external cleanliness
  • Promote provision for cyclists and luggage
  • Promote provision for newer/better stock 158’s/175’s (should gauging allow)
  • Strengthen stock capacity on peak services.

        Infrastructure:

  • Promote continuous-welded-rail
  • Maintain/improve gauging and loading (railtours, freight, newer rolling stock)
  • Remove non-signalbox manned-crossings (Kirksanton (2), Saltcoats (1))
  • Maintain critical structures (viaducts, sea-defences, Whitehaven tunnel)
  • Safeguard adjacent land and track-beds
  • Maintain crossovers at Millom, Silecroft, Bootle & Drigg
  • Maintain loop at St.Bees
  • Maintain infrastructure for railtours
  • Promote usage of Sellafield-Drigg BNFL traffic
  • Investigate removal of manual token-block (Sellafield – St.Bees)
  • Monitor planning applications.
  • Reinstatement of double track at Parton Brows

        Promotion:

  • Circulation and improvement of timetable leaflets
  • Creation of group web-site.
  • Produce line promotional leaflet.

        Ticketing/Revenue:

  • Ensure fullest possible revenue collection
  • Promote special and/or cheap travel options
  • Ensure full range of ticket availability on-train and at manned stations
  • Press for a local area network card (cardholders get a %age reduction on off-peak fares)
  • Extend the Lakes Day Ranger ticket’s northern limit from Sellafield to Carlisle

        Commuting/Tourism/Trade:                          

  • Engage with local employment, tourism, and business stakeholders
  • Promote line as a railtour/steam excursion destination
  • Promote integration with other transport providers, cross-ticketing, etc.

ts